25/07/2025
Re roofing works completed recently at The Q Church, York.
This project had been in the diary for over two years & we are extremely happy with the finished product! This project had it all including,
â—Ź The er****on of access scaffolding, supplied by
â—Ź Removal of the existing roof coverings. Including the spent lead gutters & lead hips.
â—Ź Timber repairs/replacement throughout the roof space, adding additional falls into the timber gutters, prior to lead being fitted.
â—Ź Lathing & felting the roofs which had previously been done using the traditional torching method- a messy strip to say the least!
â—Ź The sorting of all removed slates, identifying slates that could be re used. Surprisingly not much wastage with the slates as large slates are cut down to be used higher up.
â—Ź The replacement of all leads gutters using codes 5, 6 & 7 lead as required. Fitted of course to the highest standards, as per the guidelines provided by the .
â—Ź The re slating of the roofs using existing, salvaged slate, supplying additonal high quality reclaimed to complete works as required, fixing all slates using 38 & 50mm copper nails. Sourcing slates from the teams at & .
â—Ź The fitting of lead hips using code 5 lead throughout.
â—Ź The re felting of the small access hatch & flat roof area located at the apex of the roof.
â—Ź The re rendering of various damaged sections of the facade/parapet surrounding the building.
An outstanding effort from all involved. The works were originally anticipated to take around 16 weeks to complete, with the good weather & effort by the team involved, it was completed & signed off by our lovely clients in 12 weeks!