The day the aluminium comes off.
Aluminium shuttering casts a whole floor in one pour — walls, columns, slab. Then a trained crew strips it, panel by labelled panel, to reveal smooth concrete that needs no plaster.
Clean it, oil it, lift it to the next floor. One panel, 100–200 times.
One floor every 10–12 days. Cast, strip, rise.