Gebco Steel Industry

Gebco Steel Industry Turning steel into structures, from design to installation. Since 1966. This company is developing day by day due to its reputable staff and experienced crew.

The categories of work that the organization normally performs with its own forces are based on steel work and divided into 3 sections or departments:
The Design Department, which is responsible for resolving and executing the different steel structures from design to shop drawings and erection plans. The Shop work, which manufactures all kind of joinery works, achieves all metallic ideas in buil

ding and plans to accomplish all steel constructions. The Erection Team, which is capable to erect and execute all steel works from metallic joinery to constructions.

Lines don't lie. Angles don't approximate. In steel, everything is exact or it isn't right.
28/04/2026

Lines don't lie. Angles don't approximate. In steel, everything is exact or it isn't right.

22/04/2026

Not every home earns this kind of exterior.

Corten steel cladding: a finish that signals taste, permanence, and an eye for design that goes far beyond the ordinary.

Even in steel, they sing.What looks effortless to the eye is the result of precision fabrication, from the first drawing...
20/04/2026

Even in steel, they sing.
What looks effortless to the eye is the result of precision fabrication, from the first drawing to the final installation.

Because when art is this alive, the steel behind it has to be invisible, yet holding everything together.

Singing Birds, 2018
A vision by artist Nadim Karam, brought to life in steel, now standing at Chip Headquarters, Dora, Lebanon.

This is how the Rotterdam sculpture took shape.It started with structural studies and ended with a mirror polish, but th...
17/04/2026

This is how the Rotterdam sculpture took shape.
It started with structural studies and ended with a mirror polish, but the real work happened in between.

Each barrel was laser cut and rolled into form by hand, creating a striking contrast between the rugged brushed exterior and the high-shine mirror finish of the characters.

Every piece was then meticulously welded, tested, and dry-assembled in our factory to make sure everything fits perfectly.
The final result is coming, keep an eye out!

Where the drawing becomes real.
15/04/2026

Where the drawing becomes real.

Thirty years and we still find something in the raw material that excites us.
13/04/2026

Thirty years and we still find something in the raw material that excites us.

V Tower, Zalka, one of our most ambitious builds to date.A project of this scale leaves no room for anything less than t...
10/04/2026

V Tower, Zalka, one of our most ambitious builds to date.

A project of this scale leaves no room for anything less than total precision.

From the first drawing to the final installation, this crown demanded everything we had, and we delivered.

Floors above the ground, steel spanning the sky.The raw steel, the scaffolding, the structure taking shape floor by floo...
08/04/2026

Floors above the ground, steel spanning the sky.

The raw steel, the scaffolding, the structure taking shape floor by floor: this is where the real work happens.

Long before anyone sees the final result, we're already deep in it.

We don't cut corners. We don't settle for less. Every weld, every cut, every finish, done right or not at all.
31/03/2026

We don't cut corners. We don't settle for less. Every weld, every cut, every finish, done right or not at all.

30/03/2026

Some projects are built to last. Others are built to mean something. The Three Magic Flowers of Jitchu was both.

Three steel flowers, 7 meters high, and 1000 steel sculptures standing in Kagami Lake: a temporary installation within the sacred Todaiji complex in Nara, Japan, created to honor a monk whose vision shaped temple architecture 1250 years ago.

A legacy that has endured for over a millennium, brought to life in steel. This is what it means to build with purpose.

BLOM Headquarters Extension, Verdun - a full steel scope delivered by GEBCO. From structural steel to brushed stainless ...
28/03/2026

BLOM Headquarters Extension, Verdun - a full steel scope delivered by GEBCO.

From structural steel to brushed stainless steel finishes, designed, fabricated, and erected to the highest standard.

A farmhouse that doesn't just sit in its landscape, it weathers with it. Every corten sheet, every weld, fabricated and ...
27/03/2026

A farmhouse that doesn't just sit in its landscape, it weathers with it.

Every corten sheet, every weld, fabricated and installed to grow more beautiful with every passing season.

Address

Beirut

Opening Hours

Monday 08:00 - 18:00
Tuesday 08:00 - 18:00
Wednesday 08:00 - 18:00
Thursday 08:00 - 18:00
Friday 08:00 - 18:00
Saturday 08:00 - 12:00

Telephone

01-254311/2

Alerts

Be the first to know and let us send you an email when Gebco Steel Industry posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Gebco Steel Industry:

Share