14/04/2026
Our machine shop recently completed these heavy-duty hinges to operate the main intake gates at the Branch River Power Scheme in the Wairau Valley.
We machined two of these units (one for the Wairau station and one for the Argyle station). When you are dealing with hydro infrastructure, parts need to be built to withstand immense pressure and machined to exact tolerances.
Great work by our machining team delivering another project right here in Marlborough.