29/10/2026
MARKHAM provided a robust waterproofing solution for the basement slab at Charlie Parker, overcoming challenging surface conditions.
The project team was tasked with waterproofing the basement raft slab of the Charlie Parker development without relying on a traditional membrane system.
Download the case study to learn about the solution and the results. https://bit.ly/4spLjrZ