Goodman Contractors

Call Directions Website Contact the business

Goodman Contractors Goodman Contractors have been involved in earthmoving and road construction for over 50 years The business was started by Rick and his brother in 1960.

Goodman Contractors Limited (Goodmans) is a family operated Civil Engineering Contracting company situated in Waikanae, on the Kapiti Coast. Years later Rick's sons and daughter returned to the business with Rick. Goodmans employ the following staff; machine operators, supervisors, project managers, surveyors, mechanics (heavy, light vehicle, truck), fitters, welders, component rebuild specialist, spray-painters, sand-blasters, administrators, quality assurance, information technology, human resources, health & safety and finance. Goodmans has a certified and documented business system in place including Quality, Health & Safety, and Environment. Current certification includes ISO9001, ISO14001, ISO45001, and NZTA prequalification to 4A. Machinery owned by Goodmans includes various excavators, dumpers, motorscrapers, bulldozers, graders, rollers, compactors, loaders, watercarts and trucks. They range in size from 4 tonne to 90 tonne catering for a range of different work. All plant is fitted with Roll Over Protection cabs and is part of a regular servicing and maintenance programme.

27/10/2026

Goodmans 353FT Wabco Scraper making the most of the sunnny weather at O2NL! 💪

14/10/2026

Civil Drainlayer (Full time, Permanent) for Goodman Contractors Limited in Napier, Hawke's Bay.

🔧All Go at the Waikanae Yard 🔧Case 2050M Bulldozer - In for Trimble GPS installation including blade mounts, full radio ...
13/10/2026

🔧All Go at the Waikanae Yard 🔧

Case 2050M Bulldozer - In for Trimble GPS installation including blade mounts, full radio spec out, tow rope holder and towing coupler installed with a few other additions, to get ready for hard work out on the field.

Cat 740 Dump Truck Ejector Bowls - We have a rotation of ejector bowl rebuilds going to keep downtime to a minimum & ensure a replacement is available when needed.

Crusher Plant - Working hard & in for some maintenance. The crushers are currently being used at Goodrock Recycling and on-site. The on-site crushers are loaded with river rock mined from multiple material supply sites (Borrows) & break the material down to be used across the project, lowering cost & imports from elsewhere.

Hydrema 912 – Getting a birthday touch up! This little Dumper is due to have both differentials & all four final drive removed for preventative maintenance. Even our small gear needs some love to keep it happy on site.

07/10/2026

It's been 1 year since construction began on Ōtaki to north of Levin: Te Pae o Tararua, a new 24-kilometre Road of National Significance expressway.
We've had a super first year, hitting our project milestones and setting ourselves up well for the next construction season.

Here's a brief snapshot of some interesting stats from the project's first year of construction:
• We've moved 1.2 million cubic metres of earth
• We've finished 20 culverts (of a total of 70)
• 11 structures are under construction (of a total of 15)
• We've planted 185,000 plants (of about 2.2 million)
• 2500 fish have been relocated
• 27 lizards have been rehomed in the Predator Proof Area
• 150 locals (including 80 youth and jobseekers) have been employed and given training opportunities on the project.
• We've installed all the beams on two bridges – the North Island Main Trunk overbridge and the North Manakau Road overbridge- and we're on track to have them structurally complete by the end of 2026.

Season 2 of Ōtaki to north of Levin is underway and it's looking bigger and better than the last. We'll be doing a lot of earthworks, moving at least 1.6 million cubic metres (that's 400,000 more than the year just been!).

What this means is that by this time next year we'll be over 60% of the way through completing the total earthworks projected for this project.

While this is going on we'll still be working to finish the 15 structures on the project, with 7 of these on track for completion by September 2027.

When finished the new expressway will improve safety, resilience and efficiency for those moving through the Horowhenua and lower North Island. We expect to be finished with our work in late 2029.

You can keep up to date with the Ōtaki to north of Levin: Te Pae o Tararua project by following this page and subscribing to our newsletter: nzta.govt.nz/o2nl.

Proud to support our young people looking to enter the industry!
02/10/2026

Proud to support our young people looking to enter the industry!

🌟 Silver Sponsor Spotlight: Goodman Contractors 🌟

Thank you to our awesome Silver Sponsor, Goodman Contractors, for their continued support of Work Ready Kāpiti programmes and the future of our local workforce.

Goodmans have been supporters of Work Ready Kāpiti since our beginning, always going above and beyond. They always show up for rangatahi, whether that be through conducting interviews at our or offering placements through our WEX (Work Experience) programme. These experiences give rangatahi throughout Kāpiti a chance to learn about and experience real careers in civil construction first-hand.

We appreciate all that Goodmans do for us and their ongoing support!

👉 Learn more about Goodmans: https://www.goodmans.nz

Even with Winter rain slowing work down, the Plimmerton Farms team has been making GOOD progress.
12/08/2026

Even with Winter rain slowing work down, the Plimmerton Farms team has been making GOOD progress.

All go at the Waikanae Yard! 🔧Rollers -  Made in house for rolling out and precutting geogrid sheets.Wabco Scraper 222G ...
29/07/2026

All go at the Waikanae Yard! 🔧

Rollers - Made in house for rolling out and precutting geogrid sheets.

Wabco Scraper 222G - Had a broken tooth on the bullgear, now ready to replace and head back out.

CAT Dumper 730A - Has been waiting for a rebuild for at least 5 years. Our mechanics are going to be stoked when it finally leaves the workshop!

GOOD work team! 👍

09/06/2026

🚧Throwback to 1990 Macalister Park Job🚧

Rick Acquired a contract in 1990 to make a cutting hole in the hill for a new water reservoir. The council had Goodmans use this dirt to resurface the park which had been an old landfill. Quite cool to see the park now 36 years later still looking GOOD and utilised everyday by dog walkers and sports players alike.

28/04/2026
Plimmerton Farms 🚧The GOOD work continues on the Plimmerton Farms job! The photos are from the end of March but the 637s...
10/04/2026

Plimmerton Farms 🚧

The GOOD work continues on the Plimmerton Farms job! The photos are from the end of March but the 637s are running dirt flat out this month. Peat undercuts and ground improvements continue.

More SRP are being constructed and major culverts carry on.

Address

4 Anne Street
Waikanae
5036

Opening Hours

Monday 8am - 4:30pm
Tuesday 8am - 4:30pm
Wednesday 8am - 4:30pm
Thursday 8am - 4:30am
Friday 8am - 4:30pm

Telephone

0800466362

Alerts

Be the first to know and let us send you an email when Goodman Contractors posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Goodman Contractors:

Shortcuts

Share