Eigen Energy

Call Directions Website Contact the business

Eigen Energy Take control of your energy future.

Powering homes & communities with smart solar & EV charging solutions, Eigen Energy is a renewable energy integrator providing end-to-end solutions designed for long-term savings and sustainability. We are a turnkey system integrator founded in Singapore, with a focus in providing sustainable energy solutions through engineering, management and integration.

To create a comprehensive sustainable energy ecosystem, we also integrate battery energy storage systems and electric vehicle charging infrastructures, enabling homeowners, businesses, and utilities to manage renewable energy generation, storage, and consumption.

Singapore’s national EV charging standard has transitioned from TR 25 to SS 722. For building owners and operators, it c...
11/11/2026

Singapore’s national EV charging standard has transitioned from TR 25 to SS 722. For building owners and operators, it changes how new charging should be specified, installed and managed. Here's what you need to know:

1) Electrical safety and general requirements updated to cover newer system types, including wireless, mobile and battery swap charging.
2) Low-powered charging and wireless power transfer have added safety requirements for wireless charging pads. It also adds cybersecurity requirements for charging station management systems, plus guidance on smart charging and grid integration.
3) DC charging to align with the latest IEC standard, with stricter temperature control, cable insulation integrity checks and more precise power output.
If you already have chargers installed, units type-approved under TR 25 don’t need re-certification. New chargers must comply with SS 722 after a 2.5 year transition.

For most commercial sites, software, energy management and DC performance now sit alongside the hardware. That means the chargers, the management system and the building’s electrical capacity need to be planned together.

Adding or expanding charging in the next few years? We’ll review your site, your electrical capacity and how SS 722 applies to your plans.

08/11/2026

Happy Diwali to everyone!

04/11/2026

Reliable EV charging starts with understanding how a site will be used, getting the technical design right, and ensuring the infrastructure can support day to day operations. At Dunearn Village, Tesla Superchargers bring high-power DC charging to more drivers, with four V4 stalls delivering up to 250 kW and CCS2 connectors for compatible EVs.

We are humbled to have the opportunity to work with industry players to design and deliver EV charging infrastructure, with a focus on the engineering, integration and practical considerations that help keep charging installations reliable over the long term. Every site comes with its own requirements and getting the fundamentals right is what helps turn charging infrastructure into a dependable part of everyday operations.

Your roof is already part of your business. What if it could also help manage your energy costs?☀️ Solar generation can ...
27/10/2026

Your roof is already part of your business. What if it could also help manage your energy costs?

☀️ Solar generation can offset part of your daytime electricity consumption, helping reduce your ongoing electricity costs

📉 Generating some of your own electricity can reduce your exposure to changes in grid electricity prices over the life of the system and improve your costs predictability

🏢 A rooftop doesn't need to be expanded or repurposed to become productive infrastructure. With the right system design, it can generate electricity while your business continues using the space below

🌱 For businesses working towards emissions targets or responding to customer and supply-chain requirements, on-site solar can contribute to reducing Scope 2 emissions

For businesses with suitable rooftop space and significant daytime electricity demand, solar PV can turn an underutilised asset into a source of on-site electricity. Ready to start the conversation about your asset? Connect with us!

22/10/2026

Project feature! ✨ Today we’re shining a light on our work at the Singapore Rail Testing Centre. Eigen Energy delivered a full turnkey rooftop solar installation for this purpose-built LTA facility.

From initial technical planning through to installation and commissioning, our engineers ensured clean energy was integrated smoothly into the site's sustainable design.

Excited to keep helping public and commercial facilities make the most of their rooftop spaces!

22/10/2026

How does haze affect solar panels in Singapore? Our Head of Operations, Koldo Gutierrez, recently spoke to CNA about the impact of the recent haze on solar power generation.

Haze contains fine particles that scatter and absorb sunlight before it reaches solar panels. During unhealthy haze conditions, solar output can temporarily fall by around 10-20% and potentially more during severe haze.

Koldo also explained why monitoring solar performance matters, and why panel cleaning may be worth considering after extended dry periods when dust and particles remain on the panels for longer.

Watch the full CNA interview to learn more about how solar systems perform during haze: https://www.youtube.com/watch?v=fN0nsnTdqps

19/10/2026

Your home roof does more than protect your family from the elements. With rooftop solar, it could also help generate electricity for your home. Instead of leaving that space unused, you could put it to work and reduce or eliminate the amount of electricity you buy from the grid.

Not sure if your roof is suitable, or how big a system you’d need? Our engineers will check your roof, look at your past bills and show you clear savings estimates, with no obligation. 🔅

👉 Book your free site survey with us 😊

15/10/2026

For commercial rooftops, there are a few practical considerations that are worth addressing early:

1. Roof constraints
Load limits, setbacks, skylights and shading can all affect the usable roof area. Understanding the roof’s structural capacity and layout early helps inform a more practical system design.

2. Permitting and design
Technical documentation and grid requirements need to be considered from the outset. Reviewing the design and submission requirements early can help avoid unnecessary revisions later.

3. Working around an operating facility
Commercial sites rarely stop operating for a solar installation. Procurement, site access, installation and grid connection need to be coordinated around the facility’s day-to-day activities.

These may seem like small details at the planning stage, but addressing them early can make a significant difference once work begins on site. Good planning helps keep the installation safe, efficient and set up for reliable performance over the life of the system.

If you're exploring a commercial solar project, we're always happy to have a conversation about what to consider at the planning stage.

Our team had the pleasure of delivering a full turnkey rooftop solar integration for Singapore Management University. Ei...
05/10/2026

Our team had the pleasure of delivering a full turnkey rooftop solar integration for Singapore Management University. Eigen managed the project end to end, from system design and engineering through installation, integration and final commissioning.

Working within a busy urban campus meant planning carefully around existing spaces and daily activities, while making sure the solar system could be integrated smoothly.

We’re glad to have supported SMU in bringing more renewable energy into its campus and to have been part of its sustainability journey. 🔅

Eigen Energy is growing across the region, and we're hiring for three roles:🧩 Solutions Manager, Philippines 🚘  EV Engin...
28/09/2026

Eigen Energy is growing across the region, and we're hiring for three roles:
🧩 Solutions Manager, Philippines
🚘 EV Engineer, Singapore
☕ Business Development Manager, Singapore

We printed the badges before we found the people. If one of these has your name on it (or should), we'd love to hear from you.

Know someone who fits? Tag them below!

Address

100G Pasir Panjang Road Interlocal Centre #05/07
Singapore
118523

Opening Hours

Monday 09:00 - 18:00
Tuesday 09:00 - 18:00
Wednesday 09:00 - 18:00
Thursday 09:00 - 18:00
Friday 09:00 - 18:00

Telephone

+6569795811

Alerts

Be the first to know and let us send you an email when Eigen Energy posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Eigen Energy:

Shortcuts

Share

Nearby engineering companies