Not every problem with BIM coordination starts in the model itself.
Sometimes, it all starts with an outdated drawing, a design tweak that didn't get communicated, or a decision made in a meeting that never got to the team updating the model.
By the time clash detection flags an issue, the real problem might’ve been brewing for days or even weeks.
Take, for instance, an MEP engineer who routes services based on the latest info, while the structural team has already changed the layout. Both teams are doing their jobs correctly based on what they know, but their information just doesn’t match up.
That’s why coordination isn’t just about geometry; it’s about ensuring that:
-Everyone’s working off the right document revisions.
-Design changes get to all the relevant teams.
-Decisions are recorded and assigned to the appropriate folks.
-Updated information makes its way into the models before the next coordination review.
Clash detection can pinpoint conflicts, but it won’t tell you why teams are operating with different sets of information to begin with.
So, what’s the most common cause of coordination hiccups in your projects?