10/29/2026
What happens when the bids come in over budget?
On a traditional project, the design is finished before anyone puts a firm price on it. If the bids come back high, it's back to the drawing board. That costs time you didn't plan to lose.
Design-build works differently. The same team designs and builds, so costs get checked as the plan takes shape. If a choice pushes the budget, you know right away. You can adjust before the drawings are done.
No surprises at bid time. Just a building designed to fit the number you started with.