10/14/2026
Crews are hard at work in Southwest Harbor doing a highway reconstruction for MaineDOT that includes 48” concrete pipe, gabion baskets, heavy rip rap, concrete placement, roadway reconstruction and paving.
Please utilize the detour in place while this section of 102A is being repaired!