10/08/2026
How do you achieve long spans and overhangs while reducing material and er****on costs?
For the Anna Fire Department project in Texas, New Millennium collaborated with Tippen Steel Services, Conduit architecture + design, LLC, Urban Structure, and Crossland Construction Company, Inc. to develop an efficient structural steel system featuring K-Series steel joists, joist girders, 1.5-inch composite deck, and B deck.
The result? A cost-effective approach that eliminated the need for an overbuild structure while helping the municipality achieve its design and project goals.
⏬ See the link in the comments for more information. ⏬