Curt's Construction Company I personally have over 47 years of physically building homes around the Bay Area. That is not combined, like my competition!

That gives us an advantage over others. Experience is the best teacher of any craft. I started right after High School in 1978.

11/01/2026

I walked into a living room, described the job out loud, and ScopeAI Pro turned it into a line by line bid. Demo, baseboard, flooring, patch, texture and paint, all broken out by division with labor hours. Then I get the final say on every line before it becomes a PDF I can send.

Contractors, how long does a bid like this take you by hand? Tell me in the comments.

10/31/2026

Part 2. The 1950s house was framed with nothing but nails. Here is what the engineering looks like today: a shear wall tied from the foundation all the way to the roof, and a hold down anchored into the concrete.

Smart building or overkill? Builders, inspectors, homeowners, where do you land? Drop it in the comments.

10/30/2026

Every job starts as a thought. Then the sticks go up, and piece by piece it turns into something you can stand in. I've always looked at carpentry like art. My canvas just happens to be someone's home.

What's the project you're proudest of? Tell me in the comments.

Don't sign until you can check every box. ✍️This month we walked through the whole bidding process, from the truck pulli...
10/30/2026

Don't sign until you can check every box. ✍️

This month we walked through the whole bidding process, from the truck pulling up to the contract on the table. Here's all of it in one place.

☐ The contractor showed up prepared and on time
☐ You checked their license with the CSLB
☐ Every bidder got the same information
☐ The bid is written, itemized, and lists what's NOT included
☐ Allowances are realistic for what you actually want
☐ The down payment follows California's limit: 10% or $1,000, whichever is less
☐ Payments follow completed work, not the calendar
☐ Changes will be written, priced, and signed before the work
☐ You know who's carrying the risk, and there's a cap if it's cost-plus
☐ You've seen proof of insurance
☐ They told you at least one thing you didn't want to hear

Can't check them all? Don't sign yet. A good contractor will wait while you get it right.

After 47+ years, I can tell you a good job is decided before the first nail. It's decided at the table.

💾 Save this. Share it with someone about to remodel.
👉 Want my Bid Review Checklist? Send us a message with the word "BID" and I'll get it to you.

10/29/2026

This house was framed in the 1950s with nothing but nails, 2x4 rafters and skip sheathing. No hold downs. No shear wall schedule. And it is still standing 70 plus years later.

So do we really need all the engineering we put into houses today? Tell me what you think in the comments.

10/28/2026

Framing is one big jigsaw puzzle. Shear walls, blocking, straps, rafters and ridge all have to tie together, and every piece has to play with the next one. Most folks never see what's inside their walls. What do you want to learn about? Drop it in the comments.

10/27/2026

I mark everything on my shear walls. Nailing, edge nailing, every hold-down. That way my guys know exactly what goes where, and it's done right when the inspector shows up. How do you mark yours? Tell me in the comments.

The longer it takes, the more they make. ⏱️More and more, homeowners are seeing time-and-materials or cost-plus contract...
10/26/2026

The longer it takes, the more they make. ⏱️

More and more, homeowners are seeing time-and-materials or cost-plus contracts instead of a fixed bid. Before you sign one, ask a simple question. Who's carrying the risk?

🔒 Fixed bid. The contractor sets a price for the agreed scope and stands behind it. If they estimated wrong, that's on them. They have every reason to work efficiently.

⏳ Time & materials. You pay for every hour and every item. A slow day costs YOU, not them.

📈 Cost-plus. You pay all costs plus a percentage. The more the job costs, the more they make. There's no reason to save you a dime.

With a fixed bid, the contractor shares the risk. With open-ended cost-plus, you carry all of it. The meter just runs. 🚕

Now, to be fair, there are jobs where nobody can price what's behind the wall. Old homes, hidden damage, big unknowns. If cost-plus truly makes sense, protect yourself:

✅ A not-to-exceed cap in writing
✅ A fixed fee instead of a percentage
✅ Itemized invoices with receipts, every week
✅ A schedule with real milestones

Cost-plus with no cap and no schedule isn't a contract. It's a blank check.

After 47+ years, I still bid my work. My price, my risk, my word.

💾 Save this before you sign anything.
👉 Want more homeowner tips? Send us a message using the button below.

10/26/2026

Another week in the books. Roof's framed, plywood's almost done, and I walk it before and after, every single day. Tying old into new isn't easy, but it's possible when somebody's checking every stage.

The low bid is rarely the cheap one. 💸You've got three bids on the table. One is way lower than the others. Before you g...
10/23/2026

The low bid is rarely the cheap one. 💸

You've got three bids on the table. One is way lower than the others. Before you get excited, ask why.

Here's what usually hides inside a low bid:

🚫 Things left out. Demo, haul-off, permits, and patch and paint all show up later as "extras."
💡 Allowances set too low. $300 for a faucet you'll actually spend $900 on.
🧱 Cheaper materials. "Cabinets" can mean a lot of different things.
📋 No permits. It looks cheaper until you sell the house.

It's like buying a car stripped of every option, then paying full price to add them back one by one. 🚗

How to compare them the right way:
1️⃣ Lay the bids side by side, line by line.
2️⃣ Circle anything one bid includes that another doesn't.
3️⃣ Match the allowances so you're comparing the same finishes.
4️⃣ Call each contractor and ask about the gaps.
5️⃣ THEN compare the totals.

And remember this one: three wrong bids don't make one of them right. If all three are vague, the problem is the scope, not the price.

After 47+ years, I can tell you the cheapest bid on paper is often the most expensive job in real life.

💾 Save this for bid day.
👉 Want more homeowner tips? Send us a message using the button below.

Address

45581 Industrial Place Ste. 6
Fremont, CA
94538

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm

Alerts

Be the first to know and let us send you an email when Curt's Construction Company posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Curt's Construction Company:

Shortcuts

Share

Nearby engineering companies