11/03/2026
New ramp ,ADA handycap spot with signs as per code , ADA pathway to handycap ramp , new handrails formed and built on site thanks to Justin Hutchins , handrails painted to match ada , new exits lights per code, 4 inches of gravel dropped and spread on site . Final inspection underway . , , , ,