DHM Welding & Erecting

Directions Website

DHM Welding & Erecting We are a small family owned company specializing in Welding and Erecting with nearly 20yrs of heavy industrial and commercial experience.

We have a strong ability to solve and prevent obstacles on the fly with very minimal down time.

Remodel for harbor freight rtu supports and joist reforcement on existing building over 100lbs of welding rod used Smith...
10/02/2026

Remodel for harbor freight rtu supports and joist reforcement on existing building over 100lbs of welding rod used Smithfield NC

Rooms to go roof access ladder. Opening framed and ladder installed
09/15/2026

Rooms to go roof access ladder. Opening framed and ladder installed

Glade we could be a huge part of the coastal Carolina University breezeway addition. Normally we dont layout and install...
09/11/2026

Glade we could be a huge part of the coastal Carolina University breezeway addition. Normally we dont layout and install anchor rods but did on this project the old school way string lines and a level no gps everything came out spot on and everyone is very happy. 3 days to install and 2 days to fabricate.

2 existing joist reinforced 1 new RTU unit support and 1 existing RTU unit support for new boot barn in Myrtle beach
09/04/2026

2 existing joist reinforced 1 new RTU unit support and 1 existing RTU unit support for new boot barn in Myrtle beach

Roofers finally pulled roofing back so we could continue with rooms to go had to add 2' long price of decking from exist...
08/28/2026

Roofers finally pulled roofing back so we could continue with rooms to go had to add 2' long price of decking from existing joist to our new beams.

Removed and installed this 8"×8"×1/2" angle on both sides of this old red brick wall and thru bolted for new brewery in ...
08/25/2026

Removed and installed this 8"×8"×1/2" angle on both sides of this old red brick wall and thru bolted for new brewery in laurinburg sc. Will be back in a few weeks to weld plate between angles after brick is removed from underneath. Then handrail when they get closer to finishing.

Rooms to go job  today removed lower 2' of coulnms and replaced with new plates to support wind bracing after new footer...
07/22/2026

Rooms to go job today removed lower 2' of coulnms and replaced with new plates to support wind bracing after new footers are installed

Canopy was the last little piece of this project got it welded out and finished yesterday.
07/22/2026

Canopy was the last little piece of this project got it welded out and finished yesterday.

Got alot of bridging x-brace and decking layed this week despite the triple digit weather and all the revisions but buil...
07/11/2026

Got alot of bridging x-brace and decking layed this week despite the triple digit weather and all the revisions but building is coming along nicely. Still waiting for a couple questions to be answered and hopefully be finished up next week

Last 2 100° days me and Charlie Diller layed lower roof deck ran perimeter angle around building. Started setting wood c...
07/03/2026

Last 2 100° days me and Charlie Diller layed lower roof deck ran perimeter angle around building. Started setting wood coulnms and steel for outer sitting area at O.M.B. Job is going very slow due to fabrication company not having all the steel ready and alot of small engineer issues with what steel did come out hopefully when we go back next week they have everything corrected and they will be ready for us to finish this project

Address

Sun Valley Drive
Hartsville, SC
29550

Alerts

Be the first to know and let us send you an email when DHM Welding & Erecting posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share

Nearby engineering companies