05/12/2026
Scale and functionality in motion. 🚜🚢
This look at our Port Arthur, TX project demonstrates the utility of a 35' full-height sliding door and engineered structural clearance. Moving a barge into an 80' x 325' facility requires precision design and heavy-duty primary framing, especially in a high-wind coastal zone.