11/13/2026
"Absolutely perfect." ⭐
Greg's new dock went in this year while the lake was super low and the pier ramp was at its steepest, and it worked great. Now the water is at the highest level he's seen, and the ramp sits almost perfectly level. That's the engineering doing its job.
Thank you for trusting us with your new dock, and for sharing these photos! This Mooresville build is finished in TimberTech Slate Grey under a dark grey metal roof. Swipe to see it.