This is the last time I'll say this about 2028.
If you want to be in your home by summer 2028, the design agreement has to be signed in the next few weeks. Not because I'm running a sale. Because the calendar is the calendar.
After that we're having a 2029 conversation. That's a fine conversation — it's just a different one.
You've been thinking about this house for years. The thinking part is over. Either it starts this fall or it doesn't.
Apply for a 2027 design start: https://swagerbuilds.com/2027-build-calendar/
Or call/text me: (208) 520-0636
A custom home in Teton Valley takes about two years from first conversation to keys. Working backward from a summer 2028 move-in, design has to start this fall. Here's the full month-by-month calendar.