11/03/2026
We put 22 ton of compacted stone in this barn to get everything to grade, we then poured 6” of 4,500psi concrete with fiber mesh reinforcement to with stand the weight of a huge RV. The existing driveway had a significant amount of fall in it, so to keep the RV from leaning and scraping the door we came out 18’ and put a nice level ramp to get him leveled out before entering the barn.