One more from the comments: what happens when field conditions don't match the spec, does the walkthrough catch that early enough?
Usually, yes, that's the point of doing it before the first panel goes up. When it doesn't, we flag it immediately instead of installing around the problem.
With labor this tight (82% of firms report trouble filling roles, AGC 2026) and costs rising, a mismatch caught late is expensive twice: once to fix, once in schedule.
Catching it early is the cheap version.
Dealing with a mismatch on a live project? Tell us where it stands.