10/28/2026
Victory Ridge Academy students have a brand-new place to play! Ten months into Phase 2 on the Davenport campus, the ELC playground is finished, complete with a swing set designed for all ability levels and creative, inclusive play structures. Students are also enjoying the Covered Play Pavilion and its shaded sports court. Elsewhere on campus, ULC bathrooms are finished, the cafeteria’s walk-in freezer is in, and walkway canopies now connect nearly every building.
Swipe through for a look, and catch the full update on our blog.
https://aowagnerfl.com/swings-slides-and-inclusive-play-victory-ridge-academys-elc-playground-is-complete/