04/06/2026
What a couple off weeks we have had. The boys have been working hard to keep houses safe and more stable. Started in lakes entrance with a 77 stump house. Old stumps removed and The ground was hard clay but the boys dug the holes all down 600mm deep. Jacked the house to level and hung all the new concrete stumps and bang concreted them all in. Left for 2 days and went and cleaned up. the owner was so happy with the outcome 💪 next job was eagle point pretty easy job Removing 16 pine post that weren't even concreted in the ground dug all the holes deep 600mm beautiful ground to dig and put new concrete stumps in and leveled the place and bang concreted them all in. Once done left for 2 days and cleaned up and put new baseboards on the place as well looks amazing out come 💪