Trussfab

Call Directions Website Contact the business

Trussfab Roof trusses, wall frames, floor trusses and all framing materials

📣 WE'RE STILL TAKING ORDERS!Planning your next building project? Trussfab is still taking orders for quality timber fram...
11/11/2026

📣 WE'RE STILL TAKING ORDERS!

Planning your next building project? Trussfab is still taking orders for quality timber frames, roof trusses and floor trusses.

Whether you're building, renovating or preparing for your next project, our team is ready to help.

Don't leave it until the last minute. Get in touch with us today to discuss your requirements and request a quote.

📞 CALL US: 03 9799 7799

🌐 Request a quote: https://www.trussfab.com.au/request-a-quote

Australian Made & Australian Owned.

ASK THE QUESTIONS BEFORE THE TIMBER IS CUT.Before approving a truss layout, make sure the details are right.If something...
08/11/2026

ASK THE QUESTIONS BEFORE THE TIMBER IS CUT.

Before approving a truss layout, make sure the details are right.

If something doesn’t look right, a plan has changed, or an engineer has issued an updated detail — ask the question before manufacture begins.

It’s worth checking:
✔️ Latest plan version
✔️ Roof lines and wall positions
✔️ Support points and beams
✔️ Engineering updates
✔️ Hips, valleys and girder trusses
✔️ Skylights, hatches and penetrations
✔️ Any recent design changes

Getting the details sorted before the timber is cut can help avoid confusion and changes later in the process.

Read the full builder checklist: https://www.trussfab.com.au/what-builders-should-check-before-approving-truss-layouts

Have an upcoming project? Send us your plans and let’s get your frame and truss quote sorted.

Australian Made & Australian Owned.

BUILDER TIP: CHECK BEFORE MANUFACTURE 🔍Before approving your truss layout, take a few minutes to check the details caref...
06/11/2026

BUILDER TIP: CHECK BEFORE MANUFACTURE 🔍

Before approving your truss layout, take a few minutes to check the details carefully.

Make sure you’re working from the latest plans and check:
✔️ Roof lines and wall positions
✔️ Building dimensions
✔️ Support points, beams and load paths
✔️ Roof pitch, eaves and overhangs
✔️ Hips, valleys and girder trusses
✔️ Engineering updates
✔️ Skylights, access hatches and roof penetrations
✔️ Any recent design changes

If something has changed, raise it before manufacture begins. It’s much easier to sort out a detail before timber is cut and the trusses are manufactured.

👉 Read the full builder checklist: https://www.trussfab.com.au/what-builders-should-check-before-approving-truss-layouts

Send us your plans for your next frame and truss project.
Australian Made & Australian Owned.

🔍 BEFORE YOU APPROVE YOUR TRUSS LAYOUT, CHECK THE DETAILS.Approving a truss layout is an important step before manufactu...
04/11/2026

🔍 BEFORE YOU APPROVE YOUR TRUSS LAYOUT, CHECK THE DETAILS.

Approving a truss layout is an important step before manufacture begins.

But what should builders actually be checking before giving the go-ahead?

From making sure you’re working from the latest plans, to checking roof lines, wall positions, support points, engineering updates and site requirements — there are several details worth reviewing first.

And catching an issue at the approval stage is a lot easier than dealing with it after the timber has been cut or the trusses have arrived on site.

We’ve put together a practical checklist for builders covering the key things to look at before approving a truss layout.

👉 Read the full blog on the Trussfab website:https://www.trussfab.com.au/what-builders-should-check-before-approving-truss-layouts

If you have an upcoming project, send us your plans and talk to the Trussfab team about your roof trusses, floor trusses, wall frames and framing materials.

🇦🇺 Australian Made & Australian Owned

🏠 OWNER-BUILDER? SEND WHAT YOU HAVE — AND ASK EARLY.Planning a new home, extension or larger project?You don’t necessari...
01/11/2026

🏠 OWNER-BUILDER? SEND WHAT YOU HAVE — AND ASK EARLY.

Planning a new home, extension or larger project?

You don’t necessarily need to have every detail finalised before starting the conversation.

Send through the plans and information you have, and ask early.

Getting the process started early gives the Trussfab team an opportunity to review what you have, identify what may still be needed and help you understand the next steps for your roof trusses, floor trusses or wall frames.

It’s also important to let us know about:
📐 Plan changes
📄 Engineering still to come
📅 Your target timeframe
🚚 Site access or delivery considerations

Don’t wait until you’re under pressure. Start the conversation early.

👉 Read the full guide and see what owner-builders should know before ordering:
https://www.trussfab.com.au/what-owner-builders-should-know-before-ordering-trusses

SEND US WHAT YOU HAVE AND LET’S GET STARTED.

Australian Made & Australian Owned

OWNER-BUILDER TIP 🏠🔨What should you have ready before ordering trusses?If you're planning an owner-builder project, gett...
31/10/2026

OWNER-BUILDER TIP 🏠🔨

What should you have ready before ordering trusses?

If you're planning an owner-builder project, getting the right information together early can make the quoting and design process smoother.

Before you send your enquiry, have these ready:

📐 Working drawings or architectural plans
📋 Floor plans, elevations and roof layout
📄 Engineering or structural details, if available
📍 Project address or suburb
📅 Preferred delivery timeframe
🔄 Any recent plan changes
🚚 Site access details

Roof trusses, floor trusses and wall frames are designed and manufactured to suit your specific project, so complete information upfront matters.

We've put together the full guide for owner-builders, including what to prepare and what else to consider before ordering.

👉 Read the full blog:
https://www.trussfab.com.au/what-owner-builders-should-know-before-ordering-trusses

Australian Made & Australian Owned

🏠🔨 OWNER-BUILDERS: KNOW THIS BEFORE ORDERING YOUR TRUSSESTaking on your own building project is a big job — and there’s ...
28/10/2026

🏠🔨 OWNER-BUILDERS: KNOW THIS BEFORE ORDERING YOUR TRUSSES

Taking on your own building project is a big job — and there’s plenty to organise before the frame and truss stage.

Before you order roof trusses, floor trusses or wall frames, do you know what information you need to have ready?

Your plans, engineering, project stage, latest changes and even your site access can all be important when it comes to getting the process organised.

We’ve put together a practical guide covering the key things owner-builders should know before ordering trusses and wall frames.

👉 Read the full blog on the Trussfab website to see what you should have ready and why getting started early can make the process easier: https://www.trussfab.com.au/what-owner-builders-should-know-before-ordering-trusses

📍 Melbourne | Mornington Peninsula | Victoria

Australian Made & Australian Owned

🚛 TALK TO TRUSSFAB BEFORE DELIVERY DAYA smooth frame and truss delivery starts with planning before the truck arrives.If...
25/10/2026

🚛 TALK TO TRUSSFAB BEFORE DELIVERY DAY

A smooth frame and truss delivery starts with planning before the truck arrives.

If your upcoming project has:
✔️ Tight driveway or site access
✔️ Narrow streets
✔️ Gates or restricted entry
✔️ Overhead power lines or low trees
✔️ Limited space for unloading
✔️ A need for staged delivery

Let the Trussfab team know early.

We can review your requirements and discuss delivery considerations as part of the quoting and scheduling process — helping you plan for a practical delivery to site.

Trussfab supplies roof trusses, floor trusses, wall frames and framing materials across Melbourne, the Mornington Peninsula and Victoria.

👉 Planning your next project? Send your plans through to Trussfab for a quote.
Read the full guide on preparing your site for delivery:
https://www.trussfab.com.au/how-to-prepare-your-site-for-delivery

Built Properly. Measured Properly.

Australian Made & Australian Owned

🚛 BUILDER TIP | ACCESS & SET-DOWN CHECKLISTBefore the truck arrives with your roof trusses, floor trusses or wall frames...
23/10/2026

🚛 BUILDER TIP | ACCESS & SET-DOWN CHECKLIST

Before the truck arrives with your roof trusses, floor trusses or wall frames, take a few minutes to check the site.

ACCESS CHECK
☐ Can the delivery vehicle enter and leave safely?
☐ Is the driveway or street clear?
☐ Are there low branches, overhead power lines or gates to consider?
☐ Are parked cars or other obstacles restricting access?
☐ Is the ground suitable for the delivery?

SET-DOWN CHECK
☐ Is there a clear, level and safe area for unloading?
☐ Is there enough room to unload the materials?
☐ Is the area practical without interfering with other trades or machinery?

If access is tight or your site has limited space, let your supplier know early. Staged delivery may also need to be considered on larger or restricted sites. (TrussFab)

👉 Read the full checklist and find out what to prepare before delivery day:
https://www.trussfab.com.au/how-to-prepare-your-site-for-delivery

Built Properly. Measured Properly.

Australian Made & Australian Owned

🚛 IS YOUR SITE READY FOR DELIVERY DAY?Your roof trusses, floor trusses and wall frames have been prepared — but is your ...
21/10/2026

🚛 IS YOUR SITE READY FOR DELIVERY DAY?

Your roof trusses, floor trusses and wall frames have been prepared — but is your site ready when the truck arrives?

Access, unloading space, site conditions and delivery instructions can all make a difference on the day.

A little preparation beforehand can help keep delivery organised and avoid unnecessary delays.

In our latest Trussfab blog, we cover the key things builders and owner-builders should check before their frame and truss package arrives — including:
✔️ Site access
✔️ Set-down areas
✔️ Delivery staging
✔️ Site safety
✔️ Site contact and instructions
✔️ Weather and timber storage considerations

👉 Read the full blog for the complete site preparation checklist: https://www.trussfab.com.au/how-to-prepare-your-site-for-delivery

📍 Serving builders, owner-builders and developers across Melbourne, the Mornington Peninsula and Victoria.

Australian Made & Australian Owned

Address

17-18 National Drive
Dandenong South, VIC
3803

Opening Hours

Monday 7:30am - 5pm
Tuesday 7:30am - 5pm
Wednesday 7:30am - 5pm
Thursday 7:30am - 5pm
Friday 7:30am - 5pm

Telephone

+61397997799

Alerts

Be the first to know and let us send you an email when Trussfab posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Trussfab:

Shortcuts

Share

Nearby engineering companies