01/11/2026
Lammermuir House | Progress Report 🤍
There’s plenty happening behind the scenes at Lammermuir House as the structure continues to take shape.
New steel beam structures are now in place, allowing the three floors to be opened up for the new internal lift. It’s a major part of the reconfiguration and one that requires careful planning between our design and construction teams.
The rooms are also starting to become easier to read, with important plumbing works now installed for the new bathrooms.
It’s always exciting to see a project move through these structural stages and start to reveal the spaces that have been carefully planned from the beginning.
Design and construction by