Pirate Gold Corp.

Call Website

Pirate Gold Corp. Pirate Gold Corp. (TSXV: YARR) (OTCQB: YARRF) is advancing district-scale copper-gold & gold discoveries in Newfoundland.

is a Newfoundland-focused exploration company advancing its 100%-owned Treasure Island Project, a district-scale property covering more than 90 km of strike along the Valentine Lake Fault Zone. Exploration is focused on the high-grade Moosehead gold system, the Moby Dick copper-gold porphyry/epithermal discovery and multiple regional targets across the Crippleback Intrusive Suite. The Company also holds a portfolio of Newfoundland gold projects, including the district-scale Fleur de Lys Project.

NEW INTERVIEW 🏴‍☠️ With a C$13.6 million financing closed, what’s next for Pirate Gold? CEO Denis Laviolette joins Trevo...
11/03/2026

NEW INTERVIEW 🏴‍☠️ With a C$13.6 million financing closed, what’s next for Pirate Gold? CEO Denis Laviolette joins Trevor Hall on Mining Stock Daily from the New Orleans Investment Conference to discuss the next phase of exploration at Treasure Island in Newfoundland.

🎧 Listen: https://open.spotify.com/episode/2017hGlJztorQ2QzUeWWE7

On the agenda:

⚒️ Moby Dick: Barge drilling beneath the man-made Crippleback Lake to test the copper-gold system’s scale and grade continuity.

🎯 Coronation: Initial drilling at another target within the exploration portfolio.

🟡 Moosehead: Plans to advance the high-grade gold project toward a maiden resource estimate and permitting, potentially in 2027.

💰 Putting capital to work: How Pirate Gold is allocating exploration funding across its targets.

Hear what comes next.

🎧 Listen: https://open.spotify.com/episode/2017hGlJztorQ2QzUeWWE7

TSXV: YARR | OTCQB: YARRF

11/03/2026

Tim Froude checks in from Crippleback, where the black flag is flying and Pirate Gold’s barge-mounted drill is testing the heart of the Moby Dick zone beneath a man-made lake in central Newfoundland.

In this clip from Treasure Hunters Episode 20, Tim shares the latest from our Treasure Island project, including preparations to drill Coronation Lake, a second significant alteration area on the property.

Bring on the next round of holes. ⚒️

🎥 Watch the full episode: https://www.youtube.com/watch?v=nqodjeIWxTA

TSXV: YARR | OTCQB: YARRF

Watch Pirate Gold Treasure Hunters Episode 20 Here: https://www.youtube.com/watch?v=nqodjeIWxTA🏴‍☠️ HOIST THE BLACK FLAG...
10/28/2026

Watch Pirate Gold Treasure Hunters Episode 20 Here: https://www.youtube.com/watch?v=nqodjeIWxTA

🏴‍☠️ HOIST THE BLACK FLAG! We’re testing the heart of Moby Dick and taking aim at a second significant alteration area at Coronation Lake.

Join the crew at Crippleback, where our barge-mounted drill has been working for several weeks to test the Moby Dick zone.

Meanwhile, preparations are underway to drill at Coronation Lake as exploration continues across our Treasure Island project in central Newfoundland.

The hunt continues. Bring on the next round of holes.

Hoist the colours and watch Episode 20 👉 https://www.youtube.com/watch?v=nqodjeIWxTA

Hoist the Black Flag, Treasure Hunters! ☠️ It’s a beautiful Octob...

🏴‍☠️ HOIST THE BLACK FLAG! Treasure Hunters Episode 20 is out now.We’re testing the heart of Moby Dick and taking aim at...
10/28/2026

🏴‍☠️ HOIST THE BLACK FLAG! Treasure Hunters Episode 20 is out now.

We’re testing the heart of Moby Dick and taking aim at a second significant alteration area at Coronation Lake.

Join the crew at Crippleback, where our barge-mounted drill has been working for several weeks to test the Moby Dick zone.

Meanwhile, preparations are underway to drill at Coronation Lake as exploration continues across our Treasure Island project in central Newfoundland.

The hunt continues. Bring on the next round of holes.

Hoist the colours and watch Episode 20 👉 https://www.youtube.com/watch?v=nqodjeIWxTA

TSXV: YARR | OTCQB: YARRF

The black flag flies at Crippleback. 🏴‍☠️ The hunt for Moby Dick continues. Drilling at Moby Dick has already delivered:...
10/26/2026

The black flag flies at Crippleback. 🏴‍☠️ The hunt for Moby Dick continues.

Drilling at Moby Dick has already delivered:
⛏️ PGC-26-068: 0.54% CuEq over 180.8m, including 1.48% CuEq over 49.4m.
⛏️ PGC-26-058: 0.38% CuEq over 112.4m, including 0.72% CuEq over 45.0m.
⛏️ PGC-26-118: A 100 m step-out returned 0.24% CuEq over 299.4m, starting just 12.6m downhole, including 0.43% CuEq over 56.5m.

Now, our barge-mounted drill is taking the hunt beyond the shoreline. The floating platform gives our crew access to test the interpreted continuation of the Moby Dick system beneath the lakebed, where geological modelling and geophysics have pointed us toward priority targets.

The hunt continues!

TSXV: YARR | OTCQB: YARRF

NEWS | Pirate Gold Closes Brokered Private Placement for Aggregate Gross Proceeds of $13.6 MillionRead More: https://ceo...
10/22/2026

NEWS | Pirate Gold Closes Brokered Private Placement for Aggregate Gross Proceeds of $13.6 Million
Read More: https://ceo.ca//pirate-gold-corp-closes-brokered-private-placement

Pursuant to the Offering, the Company has issued: (i) an aggregate of 48,277,000 flow-through common shares (the "FT Shares") at a price of $0.215 per FT Share, for gross proceeds of $10,379,555; and (ii) an aggregate of 13,050,000 special flow-through common shares (the "Special FT Shares") at a price of $0.2475 per Special FT Share, for gross proceeds of $3,229,875, representing aggregate gross proceeds of $13,609,430. Each of the FT Shares and Special FT Shares will qualify as a "flow-through share" for the purposes of the Income Tax Act (Canada).

10/12/2026

Where Moby Dick started. Back in June, our first two holes into the alteration zone at Crippleback gave us our first glimpse of what was below. PGC-26-058 intersected 112.4 m of 0.38% CuEq, and PGC-26-068, 115 m up dip, returned 180.8 m of 0.54% CuEq, including 49.4 m of 1.48% CuEq. Copper runs through the entire stretch of core.

That was the discovery of a new copper-gold porphyry system in central Newfoundland. Since then the alteration system has grown to roughly 4 km long and 500 m deep, a 100 m step-out returned 299.4 m of 0.24% CuEq from near surface, and most of it remains undrilled. Our fully funded 50,000 m program continues.

From our Treasure Hunters series. Full episode: https://youtu.be/VhT0jtz2ogI

News release, including CuEq assumptions and QA/QC: https://www.pirategold.ca/news/pirate-gold-intersects-054-cu-eq-over-1808m-including-148-cu-eq-over-494m-in-new-grassroots-copper-gold-porphyry-epithermal-discovery-at-moby-dick

TSXV: YARR | OTCQB: YARRF

NEWS | Pirate Gold Announces up to $15 Million Brokered Flow-Through Private PlacementFull PR: https://ceo.ca//pirate-go...
10/01/2026

NEWS | Pirate Gold Announces up to $15 Million Brokered Flow-Through Private Placement
Full PR: https://ceo.ca//pirate-gold-announces-up-to-15-million-brokered-flow-through

The proposed Offering is expected to provide additional flow-through funding for eligible exploration expenditures on the Treasure Island Project, with the objective of maintaining an active drilling program into spring 2027 while preserving the Company's treasury of approximately $8 million.

Drilling continues at Moby Dick and Moosehead with three rigs active, a 4,345 line-kilometer airborne Mobile MT survey is underway across the Crippleback intrusive suite aiming to provide copper gold porphyry targets at depth, the barge-mounted rig is testing beneath the man-made Crippleback Lake testing the heart of Moby Dick, and exciting advancements from the 2026 field program has generated additional copper-gold porphyry drilling targets at Coronation Lake and Clipper Brook which are permitted for their first drilling in over 50 years.

09/29/2026

The drill is loaded. Next stop, the heart of Moby Dick.

The clues started along the shores of Crippleback Lake, a man-made lake in central Newfoundland. Now they’re pointing us toward a new drill target beneath it.

In this clip from Episode 19, geologist Cody Orisko explains how our discovery holes, preliminary modelling and geophysics guided the team right toward the middle. ⚓

Now: a barge-mounted drill program to test the prospective heart of the Moby Dick copper-gold system.

The hunt continues!

🎥 Watch the full Episode 19: https://www.youtube.com/watch?v=bMlZD_uAArE

TSXV: YARR | OTCQB: YARRF

Newfoundland & Labrador is now forecast to be the fastest-growing provincial economy in Canada in 2026, with TD Economic...
09/27/2026

Newfoundland & Labrador is now forecast to be the fastest-growing provincial economy in Canada in 2026, with TD Economics projecting 4.5% real GDP growth.

And resources are at the centre of it.

TD points directly to expanding mining activity, while the ramp-up of Equinox Gold’s Valentine Gold Mine is helping turn gold into a more meaningful contributor to the province’s economy.

For Pirate Gold, that story hits very close to home.

Our 100%-owned Treasure Island Project controls 92 km of the Valentine Lake Fault Zone, one of the major geological structures running through central Newfoundland.

On that same emerging belt:

⛏️ Valentine is now producing gold

🏴‍☠️ Pirate Gold controls a district-scale land package of more than 78,600 hectares

🥇 Moosehead has already delivered bonanza-grade gold, including 70.3 g/t Au over 9.05 m

🟠 And at Crippleback, the grassroots Moby Dick copper-gold discovery has returned 0.54% Cu Eq over 180.8 m, including 1.48% Cu Eq over 49.4 m

This is what an emerging mining district can look like.

First comes the geology.

Then the discoveries.

Then the mines, infrastructure, capital and economic impact begin to follow.

Newfoundland is no longer simply a place the mining industry is watching.

It is becoming a place the mining industry is building.

And Pirate Gold is exploring for the next major gold and copper-gold discoveries right in the middle of it.

The tide is rising in Newfoundland.

TSXV: YARR | OTCQB: YARRF

Read the Financial Post article:
https://financialpost.com/news/economy/newfoundland-labrador-forecast-lead-growth-canada

Economists expect gaps to widen between provinces as tariffs, export bans and higher energy prices heighten the divide. Read on

Address

998 Harbourside Drive, Unit 221
North Vancouver, BC
V7P3T2

Alerts

Be the first to know and let us send you an email when Pirate Gold Corp. posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share

Category

Nearby engineering companies