06/11/2026
This one was a few months back. Another builder had already poured the footings, and we came in to take care of the masonry work.
We started with a course of trench blocks, followed by a course of cavity blockwork to bring everything up to DPC level.
Once the floor had been screeded by the other builder, we were able to crack on with the remaining masonry.
There was a lot of glass in this design, so although there wasn't a huge amount of blockwork, the smaller pillars and sections needed plenty of care and attention to get everything straight, level and looking right.
We left the project at this stage, ready for the next part of the build to continue.
Just the masonry on this one, but another job we're happy to have been part of!
Need a hand with your next building project? Give us a ring.
📞 07837 991060