This page has been created to connect with those who have a more of a interest in the engineering side of the Yorkshire Wolds railway and to be the public face of the group.

Hello everyone.I am asking a big favour of you all. If you click on the below link, search for MALTON DODGER, there coul...
09/11/2026

Hello everyone.
I am asking a big favour of you all.
If you click on the below link, search for MALTON DODGER, there could be the possibility of the Yorkshire Wolds Railway being gifted £1000.
So, pleeeeeeeeease do this and help us over the Winter months.

Nominate a charity for a Movement for Good award now.

Work continues on our machinery.The RRV had new axle oils and front axle oil seal, and painting continues on jcb arms an...
11/10/2026

Work continues on our machinery.
The RRV had new axle oils and front axle oil seal, and painting continues on jcb arms and rams.
A big thank you to everyone who help in volunteering.

Saturday 3rd October 2026.It's been a while since Maffers was seen on site with a shovel in his hand and the light heart...
03/10/2026

Saturday 3rd October 2026.
It's been a while since Maffers was seen on site with a shovel in his hand and the light hearted banter was well deserved. By the end of the day all members of Pway were exhausted after slewing, levelling and packing.
The ballast wagon was brought out and put into use to mainly build up the shoulders of the Southernmost track. It had wandered a little through use and not enough ballast.
Again, this was slewed to obtain a straighter length of track.
We are still open on Sundays to the public until the end of October, so please visit us before we shut up shop.
PS. Open for Santa specials though. 😉

For those who are members, you will soon be receiving the latest issue of The  Malton Dodger.Become a member and support...
11/09/2026

For those who are members, you will soon be receiving the latest issue of The Malton Dodger.
Become a member and support our railway!

Almost a year since the last update on the overhaul of our Fowler 4240017, so here goes.Battery isolator installed, and ...
08/09/2026

Almost a year since the last update on the overhaul of our Fowler 4240017, so here goes.

Battery isolator installed, and installation of new heavy cables to the starter has been completed.

The starter motor was pulled for a visual inspection and has been deemed to be serviceable.

The cooling system has been filled with water to check for leaks, and a few small repairs were made.

The dregs of fluid have been drained from the torque converter, It didn’t smell very much like diesel!

Temporary air was applied to the clutch actuator to check the clutch operation, the air piss-ed out of every or***ce and the clutch piston rod was wobbling around like a jelly. The actuator was removed and stripped for inspection, an oilite guide bush was made and fitted to the lower guide and some very aggressive scores were honed out of the air cylinder. New imperial piston and rod seals were sourced from Swan seals.
With the actuator re-fitted, the clutch could not be adjusted so that it went over centre, and we gave up after a lot of fiddling about. The clutch arm is in the wrong position on the keyed shaft and it needs to be re-shaped in order to get the right geometry and reduce the play in the throw out bearing. TBC

To get access to the clutch, some of the remaining steel air pipes were removed including the one that crosses the engine compartment, with the safety valves on, they were all found to have severe internal corrosion and will require replacing.

The copper throttle cable assembly is too short for this engine, and an attempt was made to re-route it out of harm’s way in the engine bay. It was removed straightened, modified, lubricated, re-bent and re-fitted, and then we found that there was too much internal friction and the throttle was never going to spring return. The old cable has now been abandoned and we will find a marine cable of the correct length to run to the Rolls Royce rocker linkage on the side of the C6SFL engine block, albeit the rocker is missing on our engine and the mounting casting is damaged.

The 55A CAV dynamo was removed for inspection and all of the carbon dust and gunge was cleaned out, and as it never had a terminal cover, an new one has been machined up out of hard plastic, which worked very well.

The fuel injection pump cover was removed for inspection and the fuel rack appears to move freely, TBC on flushing all of the solids out of the supply pipework.

The radiator fan was removed to allow all of the v-belt pulleys to be cleaned up and re-painted, before fitting new V-belts. The fan spacer mounting studs to the water pump hub all had stripped threads, so these have been replaced.

While at this end, an attempt was made to re-connect the tacho cable, but it is 2’ 6” too short, and we suspect that the loco has never had a working tacho since the C6SFL engine was installed. We will have to have a new cable made for our nice mechanical tacho.

All of the fuel hoses on the engine and torque converter are rotten, and they are in the process of being replaced with hydraulic hoses with BSP ends, which have required a load of UNF to BSP adaptors to be fitted.
At the same time, a new Delphi 296 torque converter filter and engine pre-filter has been fitted under the fuel tank.

The inline filter and restrictor that controls the torque converter pressure, has been removed and cleaned, and the filter was found to be a bit mucky!

The 3 x l**e oil filter bowls have been cleaned out and the 3 x fuel filters will be next. The engine dry sump has been drained of some very black oil after the two sump plugs were fought out of the aluminium casting. The 1-1/4” UNS plug bushing on the reservoir side is toast, and a new one is being made.

On the bottom end of the loco, the long handbrake rod has been removed and straightened, and all of the pins in the brake compensating linkage have been cleaned and lubricated. The brake cross shaft at the front was found to be almost seized and required a crowbar to move, due to years without lubrication. We weren’t particular keen on pulling it apart, so we decided to try pumping some l**e oil through the grease ni***es, which are fitted at the top of the bearing castings, which is not where you would really want them to be. Anyway after a lot of oil pumping and exercising, the shaft freed off and now moves by hand! A very nice man donated a new 90mm spanner, which is just the right size for the brake adjuster nuts.

And then disaster struck, whilst having another inspection of the John Fowler final drive innards, it was found that the input bevelled pinion was loose on its splined shaft and could be rocked from side to side, with a finger tight castellated retaining collar. The Self Changing Gears final drive’s have a one piece pinion / input shaft, which is clearly of a much higher integrity than the Fowler version.
TBc on removing the input shaft assembly from the main final drive casting, for inspection, fingers crossed that the splines shaft and bevelled gear are repairable.

Here we have the brain of our RRV (Road and Rail Vehicle).This has been removed as there are many electrical gremlins th...
06/09/2026

Here we have the brain of our RRV (Road and Rail Vehicle).
This has been removed as there are many electrical gremlins that needs sorting.

Here is our JCB in bits.We are changing the pins and bushes very soon, so this has given us the chance to degrease and p...
06/09/2026

Here is our JCB in bits.
We are changing the pins and bushes very soon, so this has given us the chance to degrease and paint.
This needs to be done sooner rather than later as we have a lot of closed season work to carry out.
A big thanks to Matthew Buckle and team for their efforts.

Nearly the end of the day and what a fantastic day it's been.
23/08/2026

Nearly the end of the day and what a fantastic day it's been.

Lunch time!
23/08/2026

Lunch time!

23/08/2026

Sunday 23rd August 2026. It's not happened yet, but today the Pway gang will be severing the link to the Visitors Centre and Maintainance Facility.
One track panel is to be lifted and relocated onto the siding East of the signal box.
If you hurry, you can see the action!

Address

Yorkshire Wolds Railway, Fimber Halt, Beverley Road
Driffield
YO253HG

Alerts

Be the first to know and let us send you an email when Yorkshire Wolds Railway - engineering posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Yorkshire Wolds Railway - engineering:

Shortcuts

Share

Nearby engineering companies