03/11/2026
Doosan DX300 skyline heading north tonight after being in the workshop
some modification to the mast including a different top roller setup and a dog-leg to replace the previous set-up.
A roller guide/fairlead designed and built for the carriage
Track pads cut down/narrowed 100mm inside and outside
and a general tidy up and paint including a few other jobs whilst it was in.
Looking a lot fresher and ready to be put to work. 😎