SBC Highland Limited

SBC Highland Limited Plant hire and groundwork’s contractor covering the north of Scotland.
(2)

Recently completed project in Torness. 500mof water track installed, potable water tank install, treatment plant install...
27/04/2026

Recently completed project in Torness. 500m
of water track installed, potable water tank install, treatment plant install, site tidied and shaped up and rain water drainage installed.

Drainage and resurfacing works recently completed around this lodge. We also installed a 100m2 concrete pad for storage.
05/03/2026

Drainage and resurfacing works recently completed around this lodge. We also installed a 100m2 concrete pad for storage.

Last Friday we collected our new 12x6 tipper. 🤩 We enquired on Thursday, sent pictures of our existing trailer on Friday...
05/03/2026

Last Friday we collected our new 12x6 tipper. 🤩 We enquired on Thursday, sent pictures of our existing trailer on Friday morning, agreed a trade in price and collected the new one on Friday afternoon all specced to our needs. Great service from D.R Alexander & Son 👍😎

Treatment plant install and a site tidy up for this modern cabin.  If you have any groundwork requirements, get in touch...
05/03/2026

Treatment plant install and a site tidy up for this modern cabin.

If you have any groundwork requirements, get in touch 📞 📧

Concrete parking area and drainage installed to stop water build up and to keep it tidy
18/02/2026

Concrete parking area and drainage installed to stop water build up and to keep it tidy

Small extension installed near Evanton.
19/01/2026

Small extension installed near Evanton.

Collapsed drain blocked causing garage to flood. Drains exposed, faults found and repaired then driveway reinstated with...
19/01/2026

Collapsed drain blocked causing garage to flood. Drains exposed, faults found and repaired then driveway reinstated with aco drains across garage doors.

Garden stripped out and a concrete pad installed for a garden room. Slabbing and  retaining wall done by DT Builders.
05/11/2025

Garden stripped out and a concrete pad installed for a garden room. Slabbing and retaining wall done by DT Builders.

Driveway and parking area revamp done earlier in the summer. Levels lowered, heel kerbs and drainage installed and tarre...
05/11/2025

Driveway and parking area revamp done earlier in the summer. Levels lowered, heel kerbs and drainage installed and tarred. Tarring was completed by another contractor

Hardstand created for static caravan next to the customers new house site
05/11/2025

Hardstand created for static caravan next to the customers new house site