SBC Highland Limited Plant hire and groundwork’s contractor covering the north of Scotland.
(2)

Floor build up, drainage, internal services and sub floor in on this new build in Mulbuie. Back soon to install treatmen...
18/10/2026

Floor build up, drainage, internal services and sub floor in on this new build in Mulbuie. Back soon to install treatment plant, soakaway and services.

Another new build underway in Nairn. Steelwork and bolts set in house. Steelwork erected by others
18/10/2026

Another new build underway in Nairn. Steelwork and bolts set in house. Steelwork erected by others

New build underway in kinloss
18/10/2026

New build underway in kinloss

600 m2 driveway striped out, heel kerbs installed and driveway regulated for tar. Tar by another contractor
18/10/2026

600 m2 driveway striped out, heel kerbs installed and driveway regulated for tar. Tar by another contractor

Recent driveway revamp. Existing drive stripped out, small patio outside front door created, aco drains and heel kerbs i...
18/10/2026

Recent driveway revamp. Existing drive stripped out, small patio outside front door created, aco drains and heel kerbs installed and driveway regulated and prepped for tar. Tar done by another contractor.

Collapsed wall removed and new wall built. AllMaterials removed from site and disposed of with our hook loader and skip....
18/10/2026

Collapsed wall removed and new wall built. All
Materials removed from site and disposed of with our hook loader and skip. Being able to load the skip on the ground and transport the digger in the skip keeps the site from being cluttered and keeps costs down.

New build completed near Inverness. From the initial site strip to the finishing touches. All aspects covered. 😎
18/10/2026

New build completed near Inverness. From the initial site strip to the finishing touches. All aspects covered. 😎

Recent driveway and path works completed. Existing concrete base broken out and cleared, aco drains installed, shutters ...
18/10/2026

Recent driveway and path works completed. Existing concrete base broken out and cleared, aco drains installed, shutters built and concrete paths poured. Driveway regulated ready for tar by another contractor.

If you have any groundwork requirements for 2027 get in touch for a free quote

📞 07783285073
📧 [email protected]

05/08/2026

Our newest machine on show at the Black Isle show. 😎

A new build near Nairn recently finished. Something a bit different with a grass driveway edged with granite kerbs on th...
26/06/2026

A new build near Nairn recently finished. Something a bit different with a grass driveway edged with granite kerbs on this one