02/09/2026
A component that fails early almost never fails because of the metal itself, it fails because of a decision made somewhere between design and delivery that nobody flagged at the time. A finish that was never suited to the environment the part ended up in. A tolerance loosened slightly to save a day on the schedule. A material substitution nobody signed off on properly. None of these show up as an obvious mistake in the moment. They show up months later as a callback, which costs considerably more than the day it would have taken to get it right the first time.
riversideonline.co.uk