29/10/2026
A recent installation completed for a property in Hampshire.
This one was finished in 4 to 5 days and included 23 Aiko 490w solar panels, a Sigenergy 10kW inverter, 3 x 9.04kWh batteries and full home backup.
A strong system, a tidy finish and another home set up to make much better use of its own energy.
If solar is something you have been considering, get in touch and we can talk you through the options.