Springfield Modular

Call Directions Website Contact the business

Springfield Modular Family-Owned. Modular & Portable Buildings Tailored To Your Requirements. UK-Wide Delivery. For Sale and Hire.

As the weather turns, a lot of construction projects slow down or stop altogether, because rain, wind, and short dayligh...
03/11/2026

As the weather turns, a lot of construction projects slow down or stop altogether, because rain, wind, and short daylight hours make site work much harder to plan around. Building inside our factory in St Helens means production carries on through the winter months at the same pace as it does in summer, so the time it takes to make your building doesn’t depend on the forecast.

If you’re planning a project for the spring, winter is a good time to get the design work started so your building can be manufactured while the weather does its worst outside. Send us a message if you’d like to talk through the specification for an upcoming project.

With the Women in Construction Awards coming up on 29th October, it’s a good moment to look at where the sector actually...
22/10/2026

With the Women in Construction Awards coming up on 29th October, it’s a good moment to look at where the sector actually stands.

Women currently make up around 15% of the UK construction workforce. Building businesses where people want to stay and progress over the long term remains essential for shifting that number. As our MD Lyndsey points out, "Gender balance gives us a clear operational advantage. Bringing different perspectives into workshop planning, project delivery, and commercial strategy leads directly to better project outcomes."

Best of luck to everyone shortlisted at the Royal Lancaster London later this month. Celebrating the people pushing standard practices forward makes a genuine impact.

Are you heading to the awards? Connect with us below. We'd love to swap insights with others driving practical change in the sector.

Anyone working in local authority or public sector procurement knows that supplier checks matter just as much as the bui...
15/10/2026

Anyone working in local authority or public sector procurement knows that supplier checks matter just as much as the building itself. Springfield holds Constructionline, CHAS, SafeContractor and ISO accreditations and is a member of the MPBA, so much of the due diligence is already in place before a project starts.

Compliance and safety standards for modular buildings continue to develop, so we've written a guide to what clients need to know in 2026.

Find out more at https://www.spring-field.co.uk/why-us

Most schools we speak to are already thinking about space for next September, and the ones who start those conversations...
06/10/2026

Most schools we speak to are already thinking about space for next September, and the ones who start those conversations in the autumn usually find they have more room to get the details right. Planning, groundworks and building design all take time, and a modular classroom still needs to be scoped properly around the pupils who'll be using it.

We've put together a guide on where modular buildings fit into a school's space planning for the year ahead > https://www.spring-field.co.uk/news/sectors/planning-school-space-for-the-year-ahead-where-modular-buildings-fit-in

Every Springfield building starts life in our factory in St Helens, where our family-run team has been designing and man...
01/10/2026

Every Springfield building starts life in our factory in St Helens, where our family-run team has been designing and manufacturing portable and modular buildings for over 50 years. Because design and production happen under one roof, we can shape each building around exactly what a client needs, inside and out, rather than adapting a standard unit and hoping it fits.

If you'd like to see how that works in practice, we run factory visits so you can walk the production floor, meet the people who'll be building your project and see finishes and specifications up close before you commit. Send us a message and we'll find a date that suits you.

Springfield are gearing up for the final touches to this impressive Sport England standard changing facility for a Manch...
24/09/2026

Springfield are gearing up for the final touches to this impressive Sport England standard changing facility for a Manchester School.

We don’t just do classrooms 😁

Stay in touch for final handover photos and testimonial

Well done to team SP, it’s looking fantastic 👏👏

Here at Springfield we really are proud of the projects we complete.  Look at this lovely new early years learning facil...
18/09/2026

Here at Springfield we really are proud of the projects we complete.

Look at this lovely new early years learning facility handed over in Birmingham just last week.

It’s been an exceptionally busy Summer for the Springfield team, and we are proud as punch 😊

Happy 40th birthday to our very own Kerry McCabe.We hope you have a wonderful day full of celebrations, cake and w**e .W...
10/09/2026

Happy 40th birthday to our very own Kerry McCabe.

We hope you have a wonderful day full of celebrations, cake and w**e .

With love and best wishes from the whole of the Springfield team .

Congratulations to the Springfield team on a fantastic 3rd place finish at Westhoughton Golf Club for Nick Toone memoria...
09/09/2026

Congratulations to the Springfield team on a fantastic 3rd place finish at Westhoughton Golf Club for Nick Toone memorial golf day.

Well done team for a fantastic result for a great cause, enjoyed by all

If you're signing off capital spend on a building this year, someone will ask how it measures up against your sustainabi...
09/09/2026

If you're signing off capital spend on a building this year, someone will ask how it measures up against your sustainability criteria. That's a harder question to answer with traditional construction than it first appears, because a lot of the environmental cost sits in places that never show up on a tender document. Material waste on site, weather damage to stored materials, and the carbon cost of demolition when a site's needs change in ten years' time.

Off-site manufacturing moves those costs. Up to 90% of a Springfield building is completed in our St Helens facility, which means precision-cut components and less surplus material, insulation fitted in controlled conditions rather than in the rain, and off-cuts sorted and recycled centrally instead of skipped.

It also changes how the finished building performs. Factory tolerances allow a more precise fit around windows, doors and panels than is usually achievable on site, which cuts heat loss through draughts, and insulation goes in during manufacture, so thermal coverage stays consistent across walls, floors and ceilings rather than patchy in the awkward corners. A better shell means lower energy demand, and lower demand means you can specify smaller and more efficient heating from the outset rather than retrofitting later.

The part that tends to matter most over a twenty-year estates horizon is that our buildings are fully demountable. If an intake changes or a site is redeveloped, the building can be reconfigured, reduced, extended or relocated, which keeps the existing structure and its embodied carbon in use instead of sending it to landfill. A building that gets demolished in fifteen years was never a sustainable building, whatever its energy rating said on day one.

We've written up the full approach here: https://www.spring-field.co.uk/news/help-advice/sustainable-building-how-springfield-modular-supports-net-zero-goals

Address

Unit 2, 12 Abbotsfield Road
Saint Helens
WA94HU

Alerts

Be the first to know and let us send you an email when Springfield Modular posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Springfield Modular:

Shortcuts

Share

Nearby engineering companies