03/27/2026
We have successfully completed the compact full bathroom installation in the client's basement, which required a multitude of tasks including relocating the water heater, modifying the house drain, excavating the concrete floor to install a grinder pump, and fitting a full-size shower. With an additional bathroom now available in the house, we will proceed with remodeling the existing bathroom.