06/02/2026
Finally crossed the finish line on the latest septic project. It started with deleting the pool. The new leaching field overlapped the shallow end. All the plumbing inside the house was re routed to exit the back of the house to meet up with the new septic tank. The front of the house was prepped for a new walkway. The porch and shed will be getting additions so we installed precast footings. The sump pump was routed 100’ into the woods at the edge of the property. Lastly we transplanted a rose of Sharon and a lilac that were in the old pool area. will be hydro seeding this one tomorrow.