11/14/2026
The lights are on at Haw Creek Meadows.
Power and lighting are now active in the 2nd, 3rd, and 4th-floor units, along with the parking lot. Crews completed flooring on the 2nd and 3rd floors, finished drywall and paint on the 1st floor, and began installing sidewalks around the building.
When sidewalks go in, a building starts to feel connected to its neighborhood. Next up are overhead inspections, elevator completion, and 1st-floor countertops, each one bringing this Columbus community closer to the people it will serve.
Thank you to Thrive Alliance and Gratus for the partnership.
Built on relationships. Driven by excellence.
inherentco.com