We have made some massive progress at the Fairfield Fire Station! Transitioning from raw concrete and structural steel into defined spaces is a huge milestone.
· Training Tower (Stairs Installed): The Training Tower stairs are installed, allowing access to all three levels for finishing.
· Office Area (Framing Complete): The Office Area is taking shape; wall framing is complete, and windows, electrical, and HVAC rough-ins have been installed. We are now ready to start hanging drywall.
· Apparatus Bay (Floors Poured): Now that we have poured the concrete floors in the Apparatus Bay, it's the perfect blank canvas for the overhead electric and sprinkler system rough-ins.
It looks like the entire facility is shaping up beautifully.