06/03/2026
Kiley View’s Clubhouse is being insulated and drywalled currently with the pool starting very soon! Currently the first three buildings are also being framed with the first building at the entrance of the property starting on the second floor of framing. Also, the curb and gutter are continuing throughout the site.