06/12/2026
Progress is all about the prep work.
Sam, our senior foreman at ZC Grading, was out loading topsoil and exporting material after wrapping up the asphalt stripping and regrade at this school track. This is the kind of behind-the-scenes work that sets the stage for a clean renovation and a better finished product.
From demo to material hauling to getting the site ready for what comes next, every step matters.