Hager Energy and Automation

Hager Energy and Automation Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from Hager Energy and Automation, Energy Company, 20 Mopani Road, Blue Bend, East London.

We help South Africans cut through solar hype with ethical, expert-backed solutions—plus industrial automation and dental equipment servicing.

⚡ Myth-busting content & smart tools
🏥 Serving healthcare, agri-business, hospitality & more
💬 Message us

Thanks for being a top engager and making it onto my weekly engagement list! 🎉Anthony Gielink, Callum Lauder, Pieter En ...
01/09/2026

Thanks for being a top engager and making it onto my weekly engagement list! 🎉

Anthony Gielink, Callum Lauder, Pieter En Lene Veldman, Callum Lauder, Anita Onesimo

When having good equipment does not equate to a successful installation.We were recently contacted to assist with an ins...
23/08/2026

When having good equipment does not equate to a successful installation.

We were recently contacted to assist with an installation that kept on giving a DC overcurrent fault on a Deye inverter.

The client had “grown” their installation over time and when we were contacted the main DB was powered partially with a 5kw Deye and then at a later stage they opted to upgrade to a 12kw Deye.

The 12 kw was more than capable of supplying the entire load but for some reason the previous installer opted not to set it up that way.

Both inverters were still supplying partial loads but with AC and DC switch gear and cabling that were far under sized.

Fortunately the inverters were limited on the software not to exceed the breaker and cable capacity used.

We advised the client on a solution, and opted to remove the 5kw inverter and battery. We rewired both the AC and DC side of the 12 kw inverter, this time with correctly specced breakers, fuses and cables.

What should have been a system that provided clean, reliable and safe power from day one was let down by poor workmanship and bad design.

It has now been a month after Hager Energy and Automation rectified the install, and not a single fault reported.

Do not make the same mistake, get a qualified installer that can specify and install your equipment the right way from day one.

Contact us today if you are not confident that your current system is performing at its peak, or if you would like us to install your new PV system from the get go.


🌞

Installed a new Solis 12kw inverter at our premesis for testing.Has been running faultless now for two weeks.More than e...
15/08/2026

Installed a new Solis 12kw inverter at our premesis for testing.

Has been running faultless now for two weeks.

More than enough power to run the entire household without having to worry about overloading on the AC or DC side.

Currently paired with two of our house brand HEA 16/13 kWh batteries. And 16 605w panels across two of the three mppts.

Not a single unit fed from the grid across multiple cloudy and rainy days. With a max generation of just short of 40kWh in one day.

Contact us today to request a quote on a similar install.

South Africa’s Next Energy Reform Must Be Two-WaySouth Africa cannot tariff its way out of an energy crisis. Embedded ge...
04/06/2026

South Africa’s Next Energy Reform Must Be Two-Way

South Africa cannot tariff its way out of an energy crisis. Embedded generation, fair grid access and battery storage are essential if we want electricity to become more affordable, more reliable and less carbon-intensive. In my latest article, I explore why a modern two-way electricity system is now critical for households, business and long-term industrial competitiveness.



Read the full article here:

https://hagerenergyandautomation.co.za/blogs/news/south-africa-s-next-energy-reform-must-be-two-way

Celebrating a major milestone with Dentree Dental Studio! After installing their hybrid solar system, they've achieved r...
02/06/2026

Celebrating a major milestone with Dentree Dental Studio! After installing their hybrid solar system, they've achieved remarkable energy independence. In the first full month (May 2026), they consumed 3371kWh with less than 0.2% reliance on the grid—just 6.4kWh imported. Thanks to fine-tuning of inverter parameters, we're confident they'll reach 100% off-grid operation in June. No more load shedding, spikes, or disruptions—just peace of mind to focus on patient care. This is the reliable power solution your business deserves. Contact Hager Energy and Automation today to transform your energy future. 🌞⚡

https://www.hagerenergyandautomation.co.za

Customer Advisory NoticeSolar System Registration, Compliance, and Disconnection Requirements – South Africa1. Purpose o...
27/05/2026

Customer Advisory Notice
Solar System Registration, Compliance, and Disconnection Requirements – South Africa

1. Purpose of This Advisory
This notice provides clear, factual guidance to customers regarding:

Solar system (SSEG) registration requirements
The risk of fines or disconnection
Insurance implications
Legal requirements for off-grid systems

The aim is to ensure customers remain fully informed, compliant, and protected.

2. Legal Requirement for Solar System Registration
In South Africa, all solar systems that are connected to the electricity network fall under the Small-Scale Embedded Generation (SSEG) regulatory framework.
Key Requirement
All grid-connected systems must be registered with:

Eskom (if you are a direct Eskom customer), or
Your local municipality

This applies:

Regardless of whether your system exports electricity or not

This requirement forms part of national regulatory obligations under NERSA and the Electricity Regulation Act

3. Compliance Requirements
A compliant solar installation must include:

A valid Certificate of Compliance (CoC)
A NRS 097 compliant inverter (approved for grid connection)
A completed commissioning or SSEG test report
Installation in accordance with SANS 10142 standards

These documents form the minimum compliance pack required for safe and legal operation.

4. Fines and Disconnection – Clarification of Risk
4.1 When Enforcement Applies
Fines or disconnection may occur where:

A system is connected to the grid and not registered
The installation is non-compliant or unsafe
The customer fails to respond to requests from the utility

Authorities have increased enforcement and may disconnect systems that do not meet regulatory requirements

4.2 Important Clarification

Disconnections are generally not immediate or arbitrary
Customers are typically not penalised without engagement or warning.

The focus is on bringing systems into compliance, not punishment

5. Insurance Considerations
Insurance cover is primarily determined by installation quality and safety compliance, not registration alone.
Insurance Risks May Arise If:

There is no valid CoC
Equipment used is not approved or compliant
The installation does not meet required safety standards.

In such cases, insurance claims—particularly following fire or damage—may be rejected

Important Note
A properly installed and certified system significantly reduces insurance risk, even if registration is still in progress.

6. Off-Grid Systems and Registration
6.1 When Registration Is Not Required
Registration is not required if the property is genuinely off-grid, meaning:

The Eskom or municipal supply has been formally terminated
There is no physical connection to the electricity network

Under these conditions, the system is not classified as SSEG

6.2 Common Misunderstanding
The following do not qualify as off-grid:

Switching off the main supply
Using a changeover or isolator switch
Having a meter installed but not actively using electricity

In all these cases, the system remains legally grid-connected, and registration is still required.

7. Legal Proof of Disconnection
Customers wishing to operate off-grid must be able to provide:

Written confirmation from Eskom or the municipality that:

The supply contract is terminated
The property is disconnected

Supporting Evidence

Meter removal or permanent disconnection
Final electricity account closure

Electrical Compliance:

An updated CoC reflecting off-grid configuration

Without this documentation, the system may still be treated as grid-connected.

8. Existing Installations
Many systems installed during periods of load shedding may:

Lack complete documentation
Use non-compliant equipment
Not be registered

These systems are at higher risk of enforcement or insurance complications and should be reviewed and updated.

9. The Importance of choosing a reputable Installer
To ensure full compliance and long-term reliability, it is essential to work with a qualified and reputable provider.

Hager Energy and Automation Commitment
Hager Energy and Automation delivers:

Compliance Assurance

Use of approved, NRS-compliant equipment only
Installations aligned with SANS and SSEG standards
Full documentation provided for every system

Support and Rectification

Auditing and correction of existing installations
Guidance on regulatory requirements

Independent Verification
All installations done by H.E.A are:

Independently verified by external professionals.
Reviewed to ensure:

Full compliance
Accuracy of documentation
Unbiased assessment.

This ensures that each system meets both legal and technical standards.

10. Final Guidance
Customers are advised to ensure that their solar installation is:

Properly installed
Fully documented
Compliant with national standards
Registered where required

Summary:

Requirement:
Registration - Required for all grid-connected systems
CoC - Always required
Compliance (NRS/SANS) - Always required
Off-grid exemption - Only with formal disconnection
Insurance validity - Based on safety and compliance

Closing Statement
Compliance should be approached in a structured and informed manner.
Customers who ensure that their systems are:

Correctly installed
Properly certified
Appropriately registered or formally disconnected

will remain protected from regulatory risk and insurance exposure.

For assistance with compliance, audits, or system upgrades, customers are encouraged to contact Hager Energy and Automation for professional support.

https://www.hagerenergyandautomation.co.za

We're currently focused on making some important upgrades and performing maintenance work right here at Hager Energy and...
22/05/2026

We're currently focused on making some important upgrades and performing maintenance work right here at Hager Energy and Automation. Feeling proud to have the next generation involved.

https://www.hagerenergyandautomation.co.za

21/05/2026

6 day installation in 90 seconds. Proud to present our installation that has taken Dentree Dental studio in Pretoria completely off the grid.

21/05/2026

Address

20 Mopani Road, Blue Bend
East London
5241

Alerts

Be the first to know and let us send you an email when Hager Energy and Automation posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share