From cable installations and switchgear to commissioning and live operation, every stage plays a critical role in delivering a fully functional Electrical, Control & Instrumentation (EC&I) system.
Pre-Commissioning: Electrical insulation, instrumentation loops and fibre optic testing.
Cold Commissioning: Motor rotation, VSDs, PLC communications and safety system verification.
Hot Commissioning: Bringing the 1800 kW Medium Voltage VSD-driven exhaust fan motors to full operational load.
Final Handover: Compliance certification, test reports and quality documentation.
The result? A fully integrated, life-saving underground ventilation system, delivered through rigorous testing, technical excellence and a commitment to mine safety.