11/06/2026
Forsyth | Construction progress update
From electrical wiring and wall preparation to gyprock framing, each stage is carefully executed to ensure precision behind every surface.
Next, the space begins to take form with wall sheeting, followed by waterproofing and tiling in wet areas.
Built with intention, down to every hidden detail.
HRK+|We design. We build. We turn land into value.