12/08/2026
Did you know Hebel can be used to infill voids in both new and existing buildings?
A closer look at our recent Collins Street, Docklands project, where the C&S team completed the Hebel infill installation with no crane, no cutting onsite and minimal disruption to the existing building.
From preliminary design and Hebel dimensions through to installation, our team worked closely with ALD Corporate to deliver a practical solution for a challenging space.
Swipe through for a closer look at the project and the installation process.
Have a project with a tricky void or access challenge? Get in touch with the C&S team to see how we can help.