02/11/2026

TWO FLOORS. ONE ELECTRICAL STANDARD.

A progress look across Levels 9 and 10 at 475 Victoria Avenue, Chatswood.

While Level 9 advances through coordinated electrical rough-in, Level 10 is moving into fit-off, feature lighting and final service integration.

Different stages. The same focus on planning, workmanship and dependable delivery from the I&N Electrical Group team.

Project enquiries: [email protected]
inelectricalgroup.com.au

30/10/2026

POWER IS ONLY PART OF THE JOB.

At Level 10, 475 Victoria Avenue, the electrical installation is moving through distribution, emergency lighting and final service integration.

A dependable commercial workplace requires every system to work together—from the distribution board to compliant emergency egress and the lighting serving each space.

Installed with purpose. Checked with care. Prepared to perform.

Project enquiries: [email protected]
inelectricalgroup.com.au

28/10/2026

BEFORE THE WALLS CLOSE, THE STANDARD IS SET.

Electrical rough-in is progressing across Level 9 at 475 Victoria Avenue, Chatswood.

This stage is where accuracy matters most—outlet locations, cable routes and service coordination must all be confirmed before the walls are closed.

Careful planning now creates a cleaner installation, reduces rework and supports a reliable finished workplace.

Project enquiries: [email protected]
inelectricalgroup.com.au

26/10/2026

THE DETAILS ARE SWITCHING ON.

Feature lighting is taking shape at Level 10, 475 Victoria Avenue, Chatswood.

From service coordination above the ceiling to the final positioning of each fitting, the I&N Electrical Group team is helping bring the architectural intent to life while maintaining access, alignment and performance.

The best result comes from getting the unseen coordination right before the lights are switched on.

Project enquiries: [email protected]
inelectricalgroup.com.au

21/10/2026

WHAT THE CEILING HIDES MATTERS.

Above-ceiling and corridor progress at Level 10, 475 Victoria Avenue, Chatswood.

Before these areas are closed and finished, electrical routes and connection points must be coordinated around the ceiling system and other building services.

The final result may conceal this work, but its quality remains essential to the way the workplace performs.

Project enquiries:
Peter Lionis | Managing Director
0410 667 771
[email protected]
inelectricalgroup.com.au

18/10/2026

THE FITOUT IS TAKING SHAPE.

From a satellite view of Chatswood to the detail taking shape inside Level 10 at 475 Victoria Avenue.

The I&N Electrical Group team continues progressing the electrical works alongside ceilings, partitions and the wider construction program. Each completed pathway and connection point prepares the project for the next stage.

Good results begin with coordinated work long before the finished space is revealed.

Project enquiries:
Peter Lionis | Managing Director
0410 667 771
[email protected]
inelectricalgroup.com.au

15/10/2026

FEATURE LIGHTING STARTS LONG BEFORE SWITCH-ON.

The feature ceiling at Level 10, 475 Victoria Avenue, Chatswood is taking shape.

Before painting and final installation, the electrical set-out and connections must align with the architectural detail. Our team is preparing and protecting the lighting infrastructure while surrounding works continue.

Precision at rough-in stage is what allows the final feature to look clean, intentional and effortless.

Project enquiries:
Peter Lionis | Managing Director
0410 667 771
[email protected]
inelectricalgroup.com.au

13/10/2026

THE CEILING HIDES THE WORK. THE RESULT DEPENDS ON IT.

Above-ceiling progress at Level 10, 475 Victoria Avenue, Chatswood.

Electrical rough-in is being coordinated around the structure and other building services, with cable routes and lighting points prepared for the next stages of the fitout.

This is where good planning matters: accurate set-out, practical access and an installation designed to perform long after the ceiling closes.

Project enquiries:
Peter Lionis | Managing Director
0410 667 771
[email protected]
inelectricalgroup.com.au

11/10/2026

BEFORE THE WALLS CLOSE, THE SERVICES MUST BE RIGHT.

Progress at Level 10, 475 Victoria Avenue, Chatswood.

At this stage, the most important work is often the work that will soon disappear. The I&N Electrical Group team is coordinating electrical pathways, cabling and connection points before the walls and ceilings close.

Careful planning now supports a safer installation, cleaner finishes and reliable performance at handover.

Project enquiries:
Peter Lionis | Managing Director
0410 667 771
[email protected]
inelectricalgroup.com.au

08/10/2026

HOT WATER IS THE OUTCOME. RELIABILITY IS THE JOB.

The visible result may be simple, but dependable building services rely on the infrastructure behind them.

This final look at the hot-water replacement works at 101 Miller Street shows the coordinated electrical services, controls and connections supporting the upgraded system.

Careful installation and attention to detail help create an outcome ready to perform every day.

Address

PO Box 337 Street Clair
Sydney, NSW
2759

Opening Hours

Monday 7am - 5pm
Tuesday 7am - 5pm
Wednesday 7am - 5pm
Thursday 7am - 5pm
Friday 7am - 5pm
Saturday 7am - 12pm

Telephone

+61410667771

Alerts

Be the first to know and let us send you an email when I and N Electrical Group posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share

Category

Nearby engineering companies