16/06/2026
A closer look at the moment that our subsea project for McDermott left Arnish.
The footage below shows the completed structure moving directly from our fabrication hall onto a vessel at the adjacent Stornoway Harbour. Direct, deep-water quayside loadout on our doorstep means we can take a project from first steel cut through to full mechanical completion and load it out seamlessly. Arnish has established itself as a centre of excellence for complex energy infrastructure.
The structures, fabricated here in the Outer Hebrides, form part of the subsea infrastructure for a gas field off the east coast of Trinidad and Tobago, and are now bound for the Caribbean. The full scope, from Factory Acceptance Tests and System Integration Testing through to loadout, was completed with zero Lost Time Injuries.
Congratulations again to the entire Arnish team, whose skill, accuracy and commitment to safety made this possible, and to everyone at Navantia UK and McDermott who delivered it as one team.
Learn more about Arnish's capability here: https://navantia.co.uk/arnish/