13/05/2025
It is unusual for our entire engineering team to be simultaneously engaged in site visits, all working on different projects. Our two senior engineers are currently overseeing the construction monitoring of commercial wastewater systems installations at two separate locations. Both projects required resource consent and posed challenges, so we are pleased to have progressed to the monitoring phase. Another engineer is assessing a wastewater system that is no longer fit for purpose, with the owner seeking to upgrade. This assessment involves site testing and location option discussions with the owner. We also have an engineer conducting geotechnical site investigations on a rural site for a new build. GCEL has been engaged to prepare a geotechnical report and designs for stormwater and wastewater systems for a Building Consent application. Fortunately, the weather is favorable today.