09/07/2026
Now that our projects for this year are moving through the design process, here’s what we did on the week of 8/30 to 9/5 🗓️ :
Vehicle/Recovery 🚀🪂
- Dremelled and sanded bulkheads created last Friday
- Performed layups on tensile bars
- Attempted a dry wind with club filament winder project Doohickey, as well as modifications and CAD reworking
- Patched parachute holes, organized the shock cord bin, and started an inventory for recovery supplies
Payload 🪨🛞
- Worked on CAD for the body of the payload rover
- Explored self-righting mechanisms for the rover
- Planned out code for launch detection PCB and created a parts list to begin schematic design
Aerodynamics/Airbrakes 💨
- Researched rocket boattails
- Started construction of a weight testing structure for airbrakes
Wolfworks 🐺🔧
- Researched positioning of pressure tanks in the airframe, preventing temperature drops for a 5-10 second burn time