120-inch subsea piles. 122 feet below sea level. A cutting operation where reliability was critical.
As part of an offshore decommissioning project, Mactech Offshore was tasked with removing large-diameter subsea piles in demanding offshore conditions.
Using one of Mactech’s large-capacity inline diamond wire saws fitted with Diaquip diamond wire, the team successfully completed the cutting operation with clean, controlled cuts and minimal downtime.
The project demonstrates what can be achieved when proven subsea cutting technology is combined with diamond wire designed to perform reliably under heavy loads and challenging offshore conditions.