28/10/2026
Last day at All Energy Australia, and there’s still time to step inside a CHP.
A 2G engine won’t fit on a 6x3m stand, so we brought one you can walk through instead. Grab a VR headset at stand UU113 and look around a 3D scan of a real 2G avus installation.
Nick and Abbey are on the stand until close today. If you’re looking at biogas, landfill gas or on-site power for your site, come and say hello.
Stand UU113, MCEC Melbourne.